Exempt building work: record what will disappear from view
The useful photograph is often the one taken before the finish goes on.
How to plan records for exempt building work, capture concealed details and keep council filing separate from approval of the work.
A finished surface tells you very little about what sits behind it. If building work is exempt from consent, I would agree the record-keeping before anyone starts, especially for details that will soon be covered. The useful question is what someone would need to understand the work later, when opening it up again would be awkward.
Key points
- Agree who will record concealed work and when, before construction starts.
- Connect photographs to locations, dates and the documents used for the work.
- Check the records required for your particular exemption; council filing is not confirmation of compliance.
Identify the moments you cannot recreate
Walk through the proposed sequence with the builder or relevant trade. Ask which parts will disappear behind linings, beneath finishes or inside an assembly. Then agree how those stages will be recorded safely, and who needs to see them before covering proceeds.
For a hypothetical repair already assessed as exempt, a close photograph of an exposed junction might be useful. But without a wider view, you may not know which corner of the house it shows. I would pair the detail with an overview and a marked location on a simple plan. Agree any necessary professional checks separately; taking a photograph does not replace them.
- Who takes the record?
- What needs to be visible?
- Who needs to check the work at that stage?
- Where will the photographs and any written findings go?
Use the process overview to agree which drawings and construction support belong in your project's scope.
Discuss the documentation stagesMake each record explain something
I would give photographs short captions: location, date, what is shown and who supplied the image. Keep the original files as well as any annotated copies. Where a measurement matters, ask the person doing the work to record it clearly rather than expecting a later reader to estimate it from a photograph.
Keep the relevant drawing revision, product details and written advice beside the record. If something changes on site, ask the responsible professional whether the change affects the exemption or design, then retain their response. Do not quietly replace the original drawing and lose the explanation.
Cameron Hine's published builder feedback discusses the clarity of our drawings and specifications. That is feedback about project documentation, not evidence that any particular exempt job complies. The practical point I would take into a small job is to make the information understandable to the next person using it.
- Describe what the image shows, without claiming more than it demonstrates.
- Record unresolved questions as unresolved.
- Ask for confirmation of what was actually installed.
A builder's perspective on clear drawings, specifications and communication during construction.
Read Cameron Hine's feedback on documentationCheck the obligations for your exemption
MBIE explains that exempt building work must still meet the Building Code. Its guidance also distinguishes general exempt work from small standalone dwellings using the granny flats exemption, which have specific records and certificates to collect and submit. A personal photo folder should not be treated as the complete statutory package.
I would ask your adviser to identify the applicable record requirements before work starts, including who supplies each document and when it must be provided. Keep the explanation of why the work is exempt with the records of what was built.
File the work without overstating its status
MBIE recommends providing relevant drawings, specifications and photographs to your council for its property file. It also makes clear that lodging those documents does not mean the council has checked the work or plans. Ask your council about its current submission process and any fee.
Before closing the folder, choose one concealed detail and try to explain it using only the saved records. Can you locate it, identify the work and find the supporting information? If an answer still depends on somebody remembering a conversation, ask for that missing information now.
If you are planning changes to an existing home, bring the proposed scope and the records you already have to a conversation with Modal Architecture. We can discuss the architectural information and advice your project needs.
Our renovation service covers existing-building information, investigations and the agreed documentation scope.
Talk through a renovation's information needsSources and further reading
Source information checked 9 November 2026 at 2:29 pm GMT+13. Rules may change; check the linked official guidance for your project.
- Work you can do without a building consent | Building Performance: Page updated 15 January 2026; checked 9 November 2026. Supports continuing Building Code obligations, specific granny-flat record requirements, property-file notification and the distinction between filing and checking. The capture exercise is original practical advice.
- Our Architectural Design Process | Modal Architecture: Checked 9 November 2026 for the process and agreed support link.
- Cameron | Cameron Hine Builders Review | Modal Architecture: Feedback dated 15 December 2025; checked 9 November 2026. Attributed opinion about documentation, not a claim of exempt-work approval.
- Renovations & Extensions | Modal Architecture: Checked 9 November 2026 for existing-building investigations and agreed documentation scope.
Bring the question to your own project.
If this has helped you identify something you would like to explore, let’s talk about it.
Start a consultation