SH.SAM HODGSON
ARCHITECTURAL DESIGNER
← ALL ADVICE

Comfort & materials

Planning ventilation: give the equipment and ducts a place

How to bring ventilation into your home brief early, reserve space for equipment and duct routes, and agree the access and handover information you will need.

A ventilation system needs somewhere to go. That sounds obvious, but a tidy floor plan can leave the less visible parts of a house unexplained. Before settling the ceilings and cabinetry, I would ask where the air will enter, where it will leave and how the equipment fits between those points. Those questions belong in the design brief, even if the final product has not been chosen.

Key points

  • Ask for the proposed air routes and equipment locations to be shown alongside the architectural drawings.
  • Check maintenance access with the same care as the space needed to install the equipment.
  • Agree who will coordinate the design, check the installation and explain its operation at handover.

Describe the job before choosing the box

Start with the activities your home needs to accommodate: showers, cooking, drying washing and the people occupying bedrooms and living spaces. Ask the designer to explain how the proposed approach deals with both moisture extraction and fresh-air supply.

MBIE's active ventilation guidance explains that an extractor removes air but needs a way for replacement air to enter. I would ask for that whole journey to be explained. A fan symbol in a bathroom is only one part of the conversation.

Keep the brief in ordinary language. You might want straightforward controls, access to filters without emptying a cupboard, and an explanation of what runs continuously. The design team can turn those preferences into an appropriate proposal.

Trace a route through the building

If ducted ventilation is proposed, ask to see the routes on a plan and a section through the house. A section shows the vertical space that a floor plan cannot: ceilings, roof construction, beams and any proposed bulkheads.

BRANZ's Build guidance explains why duct layout and installation affect performance, including the value of shorter runs and fewer bends. I would use that as a reason to coordinate the route early, with the ventilation designer confirming the details for the selected system.

Imagine a hypothetical renovation where a bathroom sits beneath an upstairs bedroom. 'Run it above the ceiling' leaves several questions unanswered. Does the route cross a beam? Where does it reach outside? Would a lowered strip of ceiling be visible from the hall? Compare the options while those choices are still open.

  • Where are the outside intake and discharge points?
  • Which routes need space within walls, ceilings or cupboards?
  • Who checks clashes with structure, lighting and other services?

Draw the space needed to look after it

I would ask the supplier to show the access needed to remove a filter or service a unit, as well as the dimensions of the equipment itself. A component fitting into a void does not tell you whether someone can reach it later.

MBIE notes that correct operation and maintenance affect ventilation performance. Ask for the manufacturer's maintenance instructions before agreeing the location, then work through what following them would involve in your finished home.

  • What needs cleaning or replacement, and how often for this particular system?
  • Where will someone stand or gain safe access?
  • Can parts be removed without dismantling permanent joinery?
  • Which tasks can the household do, and which need a service technician?

Give the coordination a named owner

Ask who brings the ventilation proposal back into the architectural drawings, and when that happens. If routes or equipment change, agree who checks the consequences before installation.

The published Fraser Hill project account describes ventilation being considered alongside insulation, acoustic requirements and openings. It is a useful example of related decisions being developed together. For your own project, I would want that coordination translated into drawings and clearly allocated responsibilities.

Include the handover in your brief

Before accepting a proposal, ask what installation checks and performance testing it includes, who records the results and who will demonstrate the controls. Request a simple operating guide, maintenance information and a contact for questions.

If you are planning a home or renovation, bring your drawings and the ventilation questions they leave unanswered to a consultation. We can discuss the space to reserve and which specialist input is needed before the design moves further.

Sources and further reading

Source information checked 31 October 2026 at 9:29 am GMT+13. Rules may change; check the linked official guidance for your project.

  • Active ventilation | Building Performance: MBIE guidance updated 9 August 2023, checked 31 October 2026. Supports replacement-air provision and the importance of operation and maintenance; no project-specific sizing or compliance claim is made.
  • Trouble-free ducting performance | Build 203: BRANZ Build, August/September 2024, checked 31 October 2026. Supports early attention to duct routes, bends and installation; published test results are not presented as promised performance.
  • Fraser Hill | Modal Architecture: Published project description checked 31 October 2026; used for its account of coordinating ventilation with insulation, acoustics and openings.

ABOUT THE AUTHOR

Sam Hodgson

I’m the Founder, Director and Owner of Modal Architecture. I’m based in Auckland, spend one week each month with our Wellington team and regularly work in Queenstown.

More about me

This content is prepared with assistance from artificial intelligence tools and published under the authorship of Sam Hodgson.

Bring the question to your own project.

If this has helped you identify something you would like to explore, let’s talk about it.

Start a consultation