Planning a bathroom renovation: agree the scope before buying fittings
A new shower can mean much more than a new thing in the same corner.
How to define a bathroom renovation before shopping, with practical questions about shower construction, moisture, consent and living through the work.
It is easy to start a bathroom renovation with a vanity you like and a folder of tile photographs. I would start with a different question: how much of the room are we actually changing? Replacing tired fittings, rebuilding a shower and rearranging the whole bathroom can lead to quite different projects, even when the finished photographs look similar.
Key points
- Separate the things you want to replace from the building work needed to install them.
- Have the complete scope assessed for consent and moisture requirements before committing to purchases.
- Agree how you will manage without the room, and what must happen before it can be used again.
Write down what stays, what goes and why
Make a short list of the existing bathroom's parts: shower, bath, basin, toilet, storage, lighting, ventilation and finishes. Beside each, write keep, replace or investigate. Then explain the reason. A basin that looks dated is a different problem from one that is awkward to use.
For a hypothetical couple, the main frustration might be having nowhere to put toiletries without covering the basin. A larger vanity may help, but so might better-positioned storage. I would want the brief to say what needs improving before it names the product.
- Which items still work well?
- What makes cleaning or using the room difficult?
- Are you changing the appearance, the function, or both?
Modal's renovation service starts with the existing home and the improvements that matter to you.
Explore bathroom changes within a renovationDescribe the shower as construction, not just a finish
If you want a different shower, ask the team to explain what will be removed and what will replace it. I would want the proposed base, wall lining, waterproofing approach and connections shown together, rather than a note that simply says 'new shower'.
A flush entrance, recessed shelf or different screen is worth discussing before ordering. Ask how each choice affects the construction and the surrounding room. You do not need to design the details yourself, but you should understand what the proposal includes.
MBIE's guidance on Building Code clause E3 covers internal moisture, including wet-area surfaces that resist water penetration and can be cleaned. Choosing the visible finish is only part of resolving that work.
- Who is documenting the complete shower arrangement?
- What existing material is being retained?
- What checks and installation records will be provided?
The process explains how design choices become coordinated drawings and specifications.
See what detailed design involvesInclude air and everyday upkeep
I would put ventilation on the scope list beside the shower, not leave it as something to sort out later. MBIE recommends considering ventilation early in a renovation and extracting moist bathroom air to the outside. Ask the team to confirm the duct route, controls and how the system will be maintained.
Think about the room after use as well. Where will wet towels hang? Can you reach the areas you need to clean? Where will spare toilet rolls and cleaning supplies live? These are useful design decisions even in a small refresh.
Get the whole scope checked
Do not decide the consent position from the phrase 'bathroom renovation'. MBIE explains that some building work is exempt in defined circumstances, but Building Code obligations still apply. Ask your designer and relevant trades to assess the actual proposal, with council advice where needed.
I would ask for the basis of any exemption to be recorded against the work it covers. A conclusion about plumbing alone does not settle every other part of the renovation. Confirm the required approvals before work starts.
Plan the period without a bathroom
Before agreeing a start date, ask when the toilet, basin and shower will each be unavailable. If this is your only bathroom, decide what the household will use instead. Ask the builder which inspections, installation stages and product curing requirements affect when the room can return to use.
Bring your keep, replace and investigate list, a few photographs and any existing plans to an initial conversation. We can help turn the wish list into a scope that is ready for the next design and pricing decisions.
- Confirm who coordinates the trades and checks.
- Agree who tells you when the room is ready to use.
- Ask what could change the planned sequence.
Arrange an initial discussion about your existing bathroom, priorities and next steps.
Talk through your bathroom plansSources and further reading
Source information checked 15 October 2026 at 2:33 pm GMT+13. Rules may change; check the linked official guidance for your project.
- E3 Internal moisture | Building Performance: Checked 15 October 2026. Supports the internal-moisture and wet-area surface requirements.
- Ventilation | Building Performance: Last updated 9 August 2023; checked 15 October 2026. Supports early ventilation planning and extraction of moist bathroom air to the outside.
- Check if you need consents | Building Performance: Last updated 15 January 2026; checked 15 October 2026. Supports assessing the proposed work against exemption conditions and obtaining advice before starting.