Delivery & documentation

Construction support: what should happen between site visits?

How to agree architectural support during construction, plan useful site involvement and understand the different roles of your designer, builder and council.

A line in a proposal saying ‘construction support’ can sound reassuring without telling you much about the week ahead. Will your designer visit at agreed stages, answer questions by email, look at proposed substitutions or help with the final details? I would ask what the service looks like on an ordinary building day, including the days when nobody from the design team is on site.

Key points

  • Ask for the actual construction tasks included in your designer’s appointment.
  • Connect site visits to the work that needs to be seen and agree who gives notice.
  • Keep architectural observations, council inspections and day-to-day building management clearly identified.

Start with the help you expect to need

Write down what you imagine your designer doing once building starts. You might want advice when an existing wall reveals something unexpected, a discussion about an unavailable finish, or someone to explain whether a proposed detail still achieves the design. Bring that list to the appointment discussion rather than assuming the word ‘support’ covers it.

Then ask which tasks are included, which are additional and how extra involvement is agreed and charged. MBIE’s contract guidance makes clear that a designer’s project management role needs to be arranged. Having someone available for architectural questions does not automatically mean they are booking trades or managing deliveries.

  • Who is our contact during construction?
  • What work is included between visits?
  • What happens if the build lasts longer or needs more input than expected?

Give each visit something useful to look at

Imagine a renovation where removing a wall lining will reveal how an old window opening was formed. If the designer needs to see that junction, a visit after it has been covered again is poorly timed. In this hypothetical example, I would ask the builder and designer to agree the point when useful information will be visible and who will give the designer notice.

Use the programme to discuss those moments. Ask what happens if the work moves forward or slips, and whether photographs can answer a particular question or someone needs to attend. A standing calendar invitation is useful only if the relevant work is ready to see.

Carl from Warwick Gair Builders describes site involvement and availability for advice in his published feedback. For your own project, turn that idea into a specific conversation about when input is needed and how it will be requested.

Know what each visit covers

An architectural observation is periodic input within an agreed scope. It cannot tell you that every part of the build has been watched continuously. Ask what will be looked at, what record you will receive and how any follow-up will be handled. The builder remains responsible for construction.

Council inspections have their own purpose and requirements. MBIE explains that the required inspections are listed in the building consent and that council checks compliance, rather than judging aesthetics or workmanship quality beyond compliance. Keep those inspections and any required specialist inspections distinct from the architectural visits you commission.

  • Ask who arranges each type of visit or inspection.
  • Confirm what must remain visible for the relevant check.
  • Ask who follows up an issue and how you will know it has been addressed.

Try a week on paper

Before work starts, choose one likely construction week with your team. Put an expected site query, a planned observation and an owner decision into it. Walk through who makes contact, what information they need and what happens if the answer is not immediately available. Agree how the builder will raise anything affecting the next step.

This little rehearsal can expose an assumption while there is still time to discuss it. If you would like help defining the support for your build, bring your drawings, programme and the parts you feel least confident about to a conversation.

Sources and further reading

Source information checked 6 November 2026 at 2:30 pm GMT+13. Rules may change; check the linked official guidance for your project.

ABOUT THE AUTHOR

Sam Hodgson

I’m the Founder, Director and Owner of Modal Architecture. I’m based in Auckland, spend one week each month with our Wellington team and regularly work in Queenstown.

More about me

This content is prepared with assistance from artificial intelligence tools and published under the authorship of Sam Hodgson.

Bring the question to your own project.

If this has helped you identify something you would like to explore, let’s talk about it.

Start a consultation