Can we stay during the renovation? Five questions to ask before accepting a quote

Use five questions to compare what builders have allowed for, decide when to stay elsewhere and agree how you’ll know it’s time to come home.

If one builder prices your renovation assuming an empty house and another expects to find you making breakfast each morning, the two prices answer different questions. I’d put the living arrangements on the table before choosing between them. Here are five questions I’d take to that conversation, with a kitchen renovation as a worked example.

Key points

  • Give each builder the same description of who will be home and when.
  • Ask for the work involved in keeping part of the house occupied to be identified in the price.
  • Agree who will confirm that the household can return, and what they need to check first.

1. When you say we can stay, who are you picturing?

There’s a big difference between an adult coming home after work and a household that’s there all day. Imagine a couple replacing their kitchen. One works nights and sleeps until midday; the other takes their toddler out most mornings. Saying ‘we’ll stay in the front bedrooms’ tells the builder very little. Saying ‘someone needs to sleep beside the kitchen wall while you strip the cabinets out’ gives everyone a real decision to make.

Put the few routines you can’t move into the design brief. In this example, arranging somewhere quiet to sleep on demolition days might solve more than fitting out a spare room at home.

2. Where will the household and the building team cross paths?

Trace two journeys on the plan: a parent carrying a sleeping child from the car, and a joiner carrying a long cabinet to the kitchen. In our example both need the narrow side gate. Even though the bedrooms are untouched, that gate makes the original arrangement doubtful. Ask the builder to show you how the work area will be secured, including after the team leaves. WorkSafe’s advice on securing residential sites specifically flags children’s curiosity. A toddler remembering which door to avoid isn’t a plan.

  • Mark the household entrance and the delivery entrance.
  • Ask whether either route changes when the old cabinets come out or the new ones arrive.

3. What work have you priced to keep us here?

Ask for two versions of the awkward part of the job: one with the household present and one with it away. Keep the finished kitchen identical. In the occupied version, ask who supplies, connects and removes any temporary sink, who sets up the separation and whether anyone has allowed for an extra visit to reconnect services. In the empty-house version, ask which of those items actually disappear. Some site protection will still be needed either way.

Now the couple can compare accommodation for the disruptive stretch with the extra work that staying would require. They needn’t guess how much of a lump sum relates to their decision.

4. Who calls us if tonight’s arrangement changes?

Suppose the plumber finds a damaged pipe on Friday afternoon and the water can’t go back on as planned. The useful conversation happens before Friday: who checks the supply, who rings the household and how late can the family still arrange a bed elsewhere? Agree a decision time that suits those arrangements. Silence at knock-off shouldn’t leave anyone packing a toddler into the car to find out whether the taps work.

5. What has to be true before we come back?

‘Kitchen nearly finished’ isn’t quite the answer. The couple might happily live without cupboard handles. They do need drinking water, a usable toilet and an entrance that doesn’t take them through the work. Ask the builder to confirm the agreed conditions and that the occupied area is safe before the household returns. If the cabinet delivery still blocks the only entrance, a working sink alone won’t settle it.

I’d write those conditions beside the proposed return date. If you’re weighing up layouts and one would let your family keep a separate entrance, bring both sketches to a renovation consultation. That small difference is worth discussing while the doors are still pencil lines.

Sources and further reading

Source information checked 15 November 2026 at 9:29 am GMT+13. Rules may change; check the linked official guidance for your project.

ABOUT THE AUTHOR

Sam Hodgson

I’m the Founder, Director and Owner of Modal Architecture. I’m based in Auckland, spend one week each month with our Wellington team and regularly work in Queenstown.

More about me

This content is prepared with assistance from artificial intelligence tools and published under the authorship of Sam Hodgson.