How to assess a narrow urban site by mapping access, testing the width available for rooms and discussing construction and maintenance before settling the footprint.

On a narrow section, I would be wary of starting with the widest house we can draw. There are other things asking for that width: getting a bike to the shed, taking bins out, reaching the back garden and eventually maintaining the building. I would put those jobs on the first site sketch. Otherwise, the gaps beside the house can end up carrying a much bigger brief than anyone realised.

Key points

  • Establish the site information and restrictions before treating a sketch as a buildable footprint.
  • Show the space needed beside the house, including gates, equipment and access routes.
  • Ask for internal room widths that account for walls, storage and circulation.
  • Discuss how the home will be constructed and maintained while the layout can still change.

Find out which lines you can trust

I would begin with the title, available survey information and council property records. MBIE's site-selection guidance explains that covenants and easements can restrict use of land, and recommends a surveyor where boundary accuracy matters. A fence line is something I would ask the surveyor to check before using it as a design limit.

Ask your designer and planner to identify the current rules applying to this particular property. Have your lawyer explain relevant title restrictions. Then ask the team to distinguish confirmed constraints from assumptions still being investigated. A generic narrow-house plan cannot resolve those questions for you.

  • Which boundaries and levels have been confirmed?
  • Where are the existing services, and what still needs locating?
  • Which proposed dimensions depend on further advice or approval?

Give the side spaces a proper job

On a copy of the site plan, mark everything that needs to happen outside the rooms. Include bins, bicycles, garden tools and any proposed outdoor equipment. Draw gates open as well as closed. Ask the designer to show the actual space left between objects, rather than one clear strip with all the awkward things omitted.

For a hypothetical rear garden reached only along one side of the house, I would trace taking a wheelbarrow through that route. Where does it turn? What happens beside the heat-pump unit? This is a way to expose a conflict early, not a reason to give every site the same side passage.

  • Which jobs need a route through to the rear?
  • What will be stored along that route?
  • Can equipment be accessed for servicing without blocking the only way past?

Check what the remaining width gives you inside

Once the outside jobs are shown, ask for a dimensioned slice across the proposed plan. Include the exterior walls, any corridor, internal walls and fitted storage. Then look at the clear room width that remains.

I would compare arrangements before making everything a little narrower. Could a room occupy the full width at one end? Would moving the stair change where a corridor is needed? A courtyard could be worth testing, but show what it removes from the floor plan and adds to the outdoor work. Each option should answer a specific problem.

Ask how the building work will reach the site

I would bring a builder into this discussion while the footprint is still flexible. Ask them to sketch where deliveries could arrive, materials could wait and people could work. If the proposal depends on lifting large components into place, ask who will check that operation and its implications.

Also discuss how someone will inspect, clean and repair the finished exterior. Put unresolved access questions on the drawing for the team to address.

Karen's published consultant feedback describes constructive collaboration on complex site layouts and boundary questions. That is the kind of joined-up conversation I would want here: the layout and its practical constraints being discussed together.

Bring a marked-up site plan

For an initial conversation, bring the property information you have and mark the outside jobs you need the home to accommodate. Add the questions you cannot answer yet. We can discuss which checks would help establish a sensible starting point for your narrow site.

Sources and further reading

Source information checked 22 October 2026 at 2:33 pm GMT+13. Rules may change; check the linked official guidance for your project.

  • Choosing a site for your home | Building Performance: MBIE guidance updated 9 August 2023 and checked 22 October 2026. Supports checking title restrictions, council records and boundary accuracy. The layout and access exercises are original design advice, not prescribed dimensions or consent advice.

ABOUT THE AUTHOR

Sam Hodgson

I’m the Founder, Director and Owner of Modal Architecture. I’m based in Auckland, spend one week each month with our Wellington team and regularly work in Queenstown.

More about me

This content is prepared with assistance from artificial intelligence tools and published under the authorship of Sam Hodgson.

Bring the question to your own project.

If this has helped you identify something you would like to explore, let’s talk about it.

Start a consultation